After presenting an alternative design with the same busy hour capacity as the original concept, but at less than 40% of the proposed cost, Stea was engaged as the Principal Consultant for this extensive redevelopment.
This redevelopment trebled the size of the existing terminal footprint and required maintenance of secure operations for the 800,000 passengers during the construction year.
Our design addressed the existing shortfalls and operational issues as well as the anticipated increase of passenger numbers and provided international capabilities. The terminal upgrade was awarded the AAA 2016 Innovation & Excellence-Infrastructure Development Award.